Cabinet to grid. No production interruption.
Voltarc scopes BESS projects from switchgear room to utility interconnection—cabinet selection, BMS integration, protection coordination, and commissioning under a single contract.


Full-scope engineering from the switchgear room out
Cabinet selection, BMS configuration, protection relay coordination, and utility interconnection documentation are authored by our engineers—not subcontracted out and reconciled at commissioning.
Every integration sequence is built around your operational calendar. Energization milestones are staged so production load never transfers to a circuit that has not been verified under live conditions.
Compliance documentation—arc flash studies, protection coordination reports, utility interconnection agreements—is completed before the first cabinet is set, not assembled after the authority having jurisdiction asks for it.
Compliance-native precedent your permitting authority will recognize
Hyperscale Data Centers
Cold-Chain Logistics
Continuous-Process Manufacturing
Battery storage installations on facilities where production lines run every hour of the year—interconnection staged in parallel with live plant electrical so no unplanned transfer occurs.
BESS deployments sized for N+1 resilience across Tier III and Tier IV facilities, with protection coordination verified against utility fault-current data before commissioning.
Demand-management storage integrated into refrigerated distribution centers where a fifteen-minute outage represents millions in spoilage—sequenced around 24/7 operational constraints.
Bring us your interconnection constraints
We scope BESS projects against your existing single-line drawings, utility tariff structure, and operational calendar—before we quote a timeline or a price.